Code Red Consultants

105 West 1st Street

105 West First street is a new 7-story, 263,500 SF cutting edge life science and research building located in the Boston Seaport. The building is the new home to CRISPR Therapeutics, a biopharmaceutical company that specializes in transformative gene-based medicines and contains a variety of spaces, including research and development laboratories, office and collaboration spaces, and a fitness center and parking garage. The Ground floor level is designed to also host a range of community activities.

Serving as the project’s code consultant, Code Red Consultants was responsible for developing and presenting the building’s code compliance approach to the City of Boston’s Building and Fire Departments. Working with the base building architect, Payette, and the tenant fit out architect, Jacobs, Code Red Consultants’ services included building, fire, accessibility, and hazardous materials code consulting and Boston Fire Department laboratory permitting support.  These services included the development of a vertical opening protection approach in concert with the laboratory chemical protection approach utilizing a mix of control areas and Group H occupancies.

During construction, Code Red Consultants served as the project Smoke Control and Firestopping Special Inspector as well as providing NFPA 241, Construction Fire Safety Program support to Breakthrough Properties and Consigli Construction. In this capacity, we were responsible for conducting design and shop drawing level documentation reviews across multiple disciplines, developing Test Plans for building smoke control systems, conducting field inspections during construction, and verifying performance of the smoke control systems at the completion of construction.

Location

Boston, Mass.

Size

7 stories
263,500 SF

Cost

$88 million

Completion

2022

105 West 1st Street

105 West First street is a new 7-story, 263,500 SF cutting edge life science and research building located in the Boston Seaport. The building is the new home to CRISPR Therapeutics, a biopharmaceutical company that specializes in transformative gene-based medicines and contains a variety of spaces, including research and development laboratories, office and collaboration spaces, and a fitness center and parking garage. The Ground floor level is designed to also host a range of community activities.

Serving as the project’s code consultant, Code Red Consultants was responsible for developing and presenting the building’s code compliance approach to the City of Boston’s Building and Fire Departments. Working with the base building architect, Payette, and the tenant fit out architect, Jacobs, Code Red Consultants’ services included building, fire, accessibility, and hazardous materials code consulting and Boston Fire Department laboratory permitting support.  These services included the development of a vertical opening protection approach in concert with the laboratory chemical protection approach utilizing a mix of control areas and Group H occupancies.

During construction, Code Red Consultants served as the project Smoke Control and Firestopping Special Inspector as well as providing NFPA 241, Construction Fire Safety Program support to Breakthrough Properties and Consigli Construction. In this capacity, we were responsible for conducting design and shop drawing level documentation reviews across multiple disciplines, developing Test Plans for building smoke control systems, conducting field inspections during construction, and verifying performance of the smoke control systems at the completion of construction.

212 Stuart St, Boston, MA

212 Stuart St is a new ground-up high-end 20-story residential tower in Boston’s Back Bay.

Code Red Consultants was retained by the developer, Greystar, to serve as the Smoke Control Special Inspector. In that role we provided design reviews, system inspections, and witnessed functional testing to validate code compliance as well as safe and proper operation of the smoke control systems.  Additionally, we helped to facilitate a smooth final inspection with the City of Boston Inspectional Services Department (ISD) and Boston Fire Department (BFD) to keep the project on schedule to open for its new residents.

Separately, Code Red partnered with the general contractor, Consigli, and provided construction fire safety consulting services, including an NFPA 241 Construction Fire Safety Plan.  The Construction Fire Safety Plan documented fire and life safety parameters to be implemented by Consigli for protection of the job site and the safety of its occupants during construction.

With our wide range of expertise, we were able to offer multiple services from design through construction which ultimately helped avoid unexpected issues and facilitated project success during the final turnover process.

Location

Boston, Mass.

Size

20 stories

Completion

2022

Photography Credit

Greystar

212 Stuart St, Boston, MA

212 Stuart St is a new ground-up high-end 20-story residential tower in Boston’s Back Bay.

Code Red Consultants was retained by the developer, Greystar, to serve as the Smoke Control Special Inspector. In that role we provided design reviews, system inspections, and witnessed functional testing to validate code compliance as well as safe and proper operation of the smoke control systems.  Additionally, we helped to facilitate a smooth final inspection with the City of Boston Inspectional Services Department (ISD) and Boston Fire Department (BFD) to keep the project on schedule to open for its new residents.

Separately, Code Red partnered with the general contractor, Consigli, and provided construction fire safety consulting services, including an NFPA 241 Construction Fire Safety Plan.  The Construction Fire Safety Plan documented fire and life safety parameters to be implemented by Consigli for protection of the job site and the safety of its occupants during construction.

With our wide range of expertise, we were able to offer multiple services from design through construction which ultimately helped avoid unexpected issues and facilitated project success during the final turnover process.

Boston Arts Academy

Code Red Consultants teamed in conjunction with the City of Boston, PMA Consultants and Lee Kennedy Company for the construction of the new Boston Arts Academy in Boston, MA. The new high-rise, high school building provides transformative artistic spaces including performing arts, dance studio, music and recording rooms and breathtaking views of the Fenway neighborhood from a roof deck. Code Red Consultants worked in conjunction with Lee Kennedy to develop a comprehensive NFPA 241, Construction Fire Safety Program to ensure the project was completed on time while mitigating the risk of fire during construction. Additionally, Code Red performed Third Party Firestopping Inspections and Smoke Control Special Inspection services on behalf of the City of Boston, via PMA Consultants. Our scope was to confirm that all fire rated joint assemblies and penetrations of passive fire rated barriers had been appropriately installed and the buildings stair and elevator pressurization systems were adequately commissioned ensuring new students, faculty, and visitors were provided with a fire safe environment.

Location

Boston, Mass.

Size

154,000 SF

Cost

$125 million

Completion

2022

Boston Arts Academy

Code Red Consultants teamed in conjunction with the City of Boston, PMA Consultants and Lee Kennedy Company for the construction of the new Boston Arts Academy in Boston, MA. The new high-rise, high school building provides transformative artistic spaces including performing arts, dance studio, music and recording rooms and breathtaking views of the Fenway neighborhood from a roof deck. Code Red Consultants worked in conjunction with Lee Kennedy to develop a comprehensive NFPA 241, Construction Fire Safety Program to ensure the project was completed on time while mitigating the risk of fire during construction. Additionally, Code Red performed Third Party Firestopping Inspections and Smoke Control Special Inspection services on behalf of the City of Boston, via PMA Consultants. Our scope was to confirm that all fire rated joint assemblies and penetrations of passive fire rated barriers had been appropriately installed and the buildings stair and elevator pressurization systems were adequately commissioned ensuring new students, faculty, and visitors were provided with a fire safe environment.

Springhill Suites

Springhill Suites is Revere’s newest hotel offering spectacular views of Revere Beach. The hotel is 6 stories in height and features on site parking, restaurant, and amenities.

Code Red Consultants was retained directly by the general contractor, Callahan, and the Owner, Lixi Hospitality Group, to develop a comprehensive NFPA 241 Plan that ensured the fire safety of residents, employees, and construction personnel over the course of the project which was just feet from Revere Beach. Additionally, Code Red Consultants served as the Smoke Control Special Inspector to ensure that the new stair and elevator pressurization systems were designed and built in accordance with the applicable codes and standards.

Code Red Consultants’ focus was performing a comprehensive review of the turnover approach and interfacing with Revere city officials, where there was an upfront contract that the fire and life safety systems afforded to building occupants would not be compromised. Code Red Consultants’ hands-on approach ensured that the hotel was able to be occupied on schedule.

Location

400 Ocean Avenue, Revere, MA

Size

169,000 SF
6 stories

Completion

2022

Springhill Suites

Springhill Suites is Revere’s newest hotel offering spectacular views of Revere Beach. The hotel is 6 stories in height and features on site parking, restaurant, and amenities.

Code Red Consultants was retained directly by the general contractor, Callahan, and the Owner, Lixi Hospitality Group, to develop a comprehensive NFPA 241 Plan that ensured the fire safety of residents, employees, and construction personnel over the course of the project which was just feet from Revere Beach. Additionally, Code Red Consultants served as the Smoke Control Special Inspector to ensure that the new stair and elevator pressurization systems were designed and built in accordance with the applicable codes and standards.

Code Red Consultants’ focus was performing a comprehensive review of the turnover approach and interfacing with Revere city officials, where there was an upfront contract that the fire and life safety systems afforded to building occupants would not be compromised. Code Red Consultants’ hands-on approach ensured that the hotel was able to be occupied on schedule.

Loyola University’s Center for Innovation and Collaborative Learning

Originally constructed on the Campus of Loyola University in 1992, Beatty Hall was transformed into The Fernandez Center for Innovation and Collaborative Learning through a substantial renovation and expansion project led by Shepley Bulfinch. The newly renovated building serves as the central hub for the campus community and features active learning classrooms, creative labs and innovation spaces, career centers, interactive lounges, and a café.  In addition, the building also features a four-story atrium to enhance the communication amongst all floors in the building.

Code Red Consultants was responsible for developing and presenting the building’s code compliance approach to the City of Baltimore’s Building and Fire Departments. Code Red Consultants’ services included building, fire, and accessibility code consulting as well as performance-based design analysis of the atrium smoke control system using a computational fluid dynamics computer model.

Location

Baltimore, Maryland

Size

61,600 GSF

Cost

$40 million

Completion

Winter 2021

Photography Credit

Shepley Bulfinch

Loyola University’s Center for Innovation and Collaborative Learning

Originally constructed on the Campus of Loyola University in 1992, Beatty Hall was transformed into The Fernandez Center for Innovation and Collaborative Learning through a substantial renovation and expansion project led by Shepley Bulfinch. The newly renovated building serves as the central hub for the campus community and features active learning classrooms, creative labs and innovation spaces, career centers, interactive lounges, and a café.  In addition, the building also features a four-story atrium to enhance the communication amongst all floors in the building.

Code Red Consultants was responsible for developing and presenting the building’s code compliance approach to the City of Baltimore’s Building and Fire Departments. Code Red Consultants’ services included building, fire, and accessibility code consulting as well as performance-based design analysis of the atrium smoke control system using a computational fluid dynamics computer model.

Commonwealth Building, Boston, MA

The new Commonwealth Building sits among Kenmore Square below the iconic Citgo Sign, minutes away from Boston’s Fenway Park.  Stantec was responsible for the design of this new eight-story, ~130,000 square foot commercial building for Related Beal.  The building consisted of two levels of below-grade parking, ground floor retail space, seven levels of above-grade office, and a mechanical penthouse.

Code Red Consultants served as the code consultant on the project to Related Beal and developed a detailed code approach documenting compliance with the local building and fire codes and reviewed architectural plans for code compliance.

Code Red Consultants was also retained directly by Related Beal to develop a comprehensive NFPA 241, Construction Fire Safety Plan that ensured the fire safety of construction personnel, the fire department, and the surrounding community over the course of the project. Additionally, Code Red Consultants served as the Fire Stopping Special Inspector, ensuring the passive fire protection systems were appropriately selected and installed.  As the Smoke Control Special Inspector, we ensured that the new stair pressurization systems were designed, installed, and operated in accordance with the applicable codes and standards.

Location

Boston, Mass.

Size

130,000 SF

Cost

$60-64 million

Completion

January 2022

Photography Credit

Related Beal and Mark Woods

Commonwealth Building, Boston, MA

The new Commonwealth Building sits among Kenmore Square below the iconic Citgo Sign, minutes away from Boston’s Fenway Park.  Stantec was responsible for the design of this new eight-story, ~130,000 square foot commercial building for Related Beal.  The building consisted of two levels of below-grade parking, ground floor retail space, seven levels of above-grade office, and a mechanical penthouse.

Code Red Consultants served as the code consultant on the project to Related Beal and developed a detailed code approach documenting compliance with the local building and fire codes and reviewed architectural plans for code compliance.

Code Red Consultants was also retained directly by Related Beal to develop a comprehensive NFPA 241, Construction Fire Safety Plan that ensured the fire safety of construction personnel, the fire department, and the surrounding community over the course of the project. Additionally, Code Red Consultants served as the Fire Stopping Special Inspector, ensuring the passive fire protection systems were appropriately selected and installed.  As the Smoke Control Special Inspector, we ensured that the new stair pressurization systems were designed, installed, and operated in accordance with the applicable codes and standards.

Harvard University Science and Engineering Complex, Boston, MA

The new Harvard University Science and Engineering Complex (SEC) is an eight-story, 544,000 square foot building featuring a variety of classrooms, wet and dry research labs, amenity spaces, and teaching labs.  The building’s two glazed atria provide vertical interconnection between multiple stories and allow for light-filled gathering and social areas.  This LEED Platinum building paired sustainability and performance with a striking exterior and interior design to create a center for scientific research and student gathering.

Serving as the project’s code consultant, Code Red Consultants was responsible for developing and presenting the building’s code compliance approach to the City of Boston’s Building and Fire Departments. Working with architect Behnisch Architekten, Code Red Consultants’ services included building, fire, accessibility, and hazardous materials code consulting as well as performance-based design analysis of the atrium smoke control system using a computational fluid dynamics computer model.  Included in the code approach were several State Building Code Variances related to (1) sprinkle-protected glass control area boundaries, (2) stair discharge through an atrium, and (3) the storage of flammable liquids in a basement.

During construction, Code Red Consultants served as the project NFPA 3 & 4 Commissioning & Integrated Testing Agent, as well as the Smoke Control Special Inspector.  In this capacity, we were responsible for conducting design and shop drawing level documentation reviews across multiple disciplines, development of Test Plans for building smoke control and integrated fire and life safety systems, conducting field inspections during construction, and verifying performance of the integrated systems at the completion of construction. We also worked closely with the design team and University to prepare the Boston Fire Department (BFD) Place of Assembly permit drawings and applications for the numerous and flexible amenity areas of the building.

Location

Boston, Mass.

Size

544,000 SF

Cost

$1 billion

Completion

2021

Photography Credit

Brad Feinknopf/OTTO (designed by Behnisch Architekten)

Rending Credit

Behnisch Architekten

Harvard University Science and Engineering Complex, Boston, MA

The new Harvard University Science and Engineering Complex (SEC) is an eight-story, 544,000 square foot building featuring a variety of classrooms, wet and dry research labs, amenity spaces, and teaching labs.  The building’s two glazed atria provide vertical interconnection between multiple stories and allow for light-filled gathering and social areas.  This LEED Platinum building paired sustainability and performance with a striking exterior and interior design to create a center for scientific research and student gathering.

Serving as the project’s code consultant, Code Red Consultants was responsible for developing and presenting the building’s code compliance approach to the City of Boston’s Building and Fire Departments. Working with architect Behnisch Architekten, Code Red Consultants’ services included building, fire, accessibility, and hazardous materials code consulting as well as performance-based design analysis of the atrium smoke control system using a computational fluid dynamics computer model.  Included in the code approach were several State Building Code Variances related to (1) sprinkle-protected glass control area boundaries, (2) stair discharge through an atrium, and (3) the storage of flammable liquids in a basement.

During construction, Code Red Consultants served as the project NFPA 3 & 4 Commissioning & Integrated Testing Agent, as well as the Smoke Control Special Inspector.  In this capacity, we were responsible for conducting design and shop drawing level documentation reviews across multiple disciplines, development of Test Plans for building smoke control and integrated fire and life safety systems, conducting field inspections during construction, and verifying performance of the integrated systems at the completion of construction. We also worked closely with the design team and University to prepare the Boston Fire Department (BFD) Place of Assembly permit drawings and applications for the numerous and flexible amenity areas of the building.

Boynton Yards – 101 South Street

101 South Street in Somerville, MA is the first of three, state-of-the-art life science buildings on the Boynton Yards campus. The building is nine-stories in height, with a footprint area of approximately 35,000 square feet.  It contains four levels of below grade parking, a ground floor lobby and future retail space(s), shell and core future offices/labs on levels 2-9, and two mechanical penthouse levels. Code Red Consultants worked closely with the Architect (SGA), Developer (Leggat McCall Properties), and General Contractor (Shawmut Design and Construction) to provide a full suite of fire protection and life safety consulting services over the course of both the design and construction phases of the project.

For the design phase of the project, Code Red Consultants served as the project code consultant to SGA to provide fire protection and life safety code consulting services. Our involvement included navigating the various code requirements related to the building with an objective of meeting the project’s design intent.

During the construction phase of the project, Code Red Consultants assisted in the development of a NFPA 241 Construction Fire Safety Plan to provide the Somerville Fire Department with key life safety site and system information necessary in the event of a fire or other emergency. The document summarized the logistics associated with site access and active fire protection and life safety systems at the time of response. In collaboration with Leggat McCall, Code Red Consultants also worked to develop an owner’s master construction fire safety program for the initial shell and core occupancy of the building. Lastly, Code Red Consultants was responsible for serving as the Smoke Control Special Inspector (SCSI) for the building’s pressurized stairways. During inspection, the SCSI verified that the smoke control equipment and system complied with the requirements contained within the applicable codes. To achieve this, Code Red Consultants performed drawing reviews of shop submittals, participated in meetings with the design team and AHJ’s, conducted site visits to witness duct leakage testing and to review damper locations and installation, and piloted comprehensive integrated testing of the smoke control, fire alarm, fire protection systems, and electrical systems. The systems were accepted by the Somerville Fire Department on the first acceptance test, helping Shawmut and Leggat McCall complete the project.

Location

Somerville, Mass.

Size

35,000 SF
9 Stories

Completion

Winter 2021

Boynton Yards – 101 South Street

101 South Street in Somerville, MA is the first of three, state-of-the-art life science buildings on the Boynton Yards campus. The building is nine-stories in height, with a footprint area of approximately 35,000 square feet.  It contains four levels of below grade parking, a ground floor lobby and future retail space(s), shell and core future offices/labs on levels 2-9, and two mechanical penthouse levels. Code Red Consultants worked closely with the Architect (SGA), Developer (Leggat McCall Properties), and General Contractor (Shawmut Design and Construction) to provide a full suite of fire protection and life safety consulting services over the course of both the design and construction phases of the project.

For the design phase of the project, Code Red Consultants served as the project code consultant to SGA to provide fire protection and life safety code consulting services. Our involvement included navigating the various code requirements related to the building with an objective of meeting the project’s design intent.

During the construction phase of the project, Code Red Consultants assisted in the development of a NFPA 241 Construction Fire Safety Plan to provide the Somerville Fire Department with key life safety site and system information necessary in the event of a fire or other emergency. The document summarized the logistics associated with site access and active fire protection and life safety systems at the time of response. In collaboration with Leggat McCall, Code Red Consultants also worked to develop an owner’s master construction fire safety program for the initial shell and core occupancy of the building. Lastly, Code Red Consultants was responsible for serving as the Smoke Control Special Inspector (SCSI) for the building’s pressurized stairways. During inspection, the SCSI verified that the smoke control equipment and system complied with the requirements contained within the applicable codes. To achieve this, Code Red Consultants performed drawing reviews of shop submittals, participated in meetings with the design team and AHJ’s, conducted site visits to witness duct leakage testing and to review damper locations and installation, and piloted comprehensive integrated testing of the smoke control, fire alarm, fire protection systems, and electrical systems. The systems were accepted by the Somerville Fire Department on the first acceptance test, helping Shawmut and Leggat McCall complete the project.

The Quinn, Boston, MA

The Quinn is a new 273-unit apartment and condominium building located at 370-390 Harrison Avenue in Boston’s South End neighborhood.

Code Red Consultants was retained by the owner, Related Beal, to develop a comprehensive NFPA 241 Construction Fire Safety Plan. The Plan provided the Boston Fire Department with key life safety site and system information necessary in the event of a fire or other emergency. The document helped address the various logistical (or project) challenges while maintaining a safe environment for construction personnel and the general public all the while meeting project deadlines.

Code Red Consultants also served as the Smoke Control Special Inspector (SCSI) and verified that the smoke control equipment and system was installed in compliance with the requirements of 780 CMR, Massachusetts State Building Code, as enforced by the Boston Fire Department. This system acceptance testing required comprehensive, coordinated, testing of the building’s smoke control, fire alarm, fire protection systems.  The test passed on the first time, which allowed for occupancy approvals from the City.

Location

Boston, Mass.

Size

356,000 SF
14 Stories

Cost

$140 million

Completion

December 2021

The Quinn, Boston, MA

The Quinn is a new 273-unit apartment and condominium building located at 370-390 Harrison Avenue in Boston’s South End neighborhood.

Code Red Consultants was retained by the owner, Related Beal, to develop a comprehensive NFPA 241 Construction Fire Safety Plan. The Plan provided the Boston Fire Department with key life safety site and system information necessary in the event of a fire or other emergency. The document helped address the various logistical (or project) challenges while maintaining a safe environment for construction personnel and the general public all the while meeting project deadlines.

Code Red Consultants also served as the Smoke Control Special Inspector (SCSI) and verified that the smoke control equipment and system was installed in compliance with the requirements of 780 CMR, Massachusetts State Building Code, as enforced by the Boston Fire Department. This system acceptance testing required comprehensive, coordinated, testing of the building’s smoke control, fire alarm, fire protection systems.  The test passed on the first time, which allowed for occupancy approvals from the City.

Alcott Apartments

Code Red Consultants worked closely with Equity Residential and AECOM Tishman on the new Alcott Apartments mixed-use building in a Boston, Massachusetts’ West End neighborhood. The project consists of a new 44 story tower containing 470 residential units, First Floor retail and 37th Floor Sky Deck. The building also includes 5 levels of sub-grade parking.

Code Red Consultants collaborated with both Equity Residential and AECOM Tishman to assist in the development of a phased occupancy plan for the building (including phasing of the fire alarm, fire protection and other life safety systems) which helped to allow the building to open on time with ongoing upper floor construction while maintaining the necessary levels of fire protection and life safety for the building.

In addition, Code Red performed Smoke Control Special Inspections of the building’s two pressurized stairways. As the Smoke Control Special Inspector, Code Red was responsible for conducting design and shop drawing level documentation reviews across multiple disciplines, development of Test Plans for the building’s smoke control systems and verifying performance of the smoke control systems at the completion of construction.

Location

Boston, Mass.

Size

44 stories

Completion

September 2021

Photography Credit

Dan Abboud

Alcott Apartments

Code Red Consultants worked closely with Equity Residential and AECOM Tishman on the new Alcott Apartments mixed-use building in a Boston, Massachusetts’ West End neighborhood. The project consists of a new 44 story tower containing 470 residential units, First Floor retail and 37th Floor Sky Deck. The building also includes 5 levels of sub-grade parking.

Code Red Consultants collaborated with both Equity Residential and AECOM Tishman to assist in the development of a phased occupancy plan for the building (including phasing of the fire alarm, fire protection and other life safety systems) which helped to allow the building to open on time with ongoing upper floor construction while maintaining the necessary levels of fire protection and life safety for the building.

In addition, Code Red performed Smoke Control Special Inspections of the building’s two pressurized stairways. As the Smoke Control Special Inspector, Code Red was responsible for conducting design and shop drawing level documentation reviews across multiple disciplines, development of Test Plans for the building’s smoke control systems and verifying performance of the smoke control systems at the completion of construction.