Parcel JK, Cambridge Crossing

Parcel JK is the first building to come online in the 4.5 M SF mixed-use Cambridge Crossing neighborhood currently in development by DivcoWest. Designed as a state-of-the-art science and technology building, Parcel JK comprises approximately 430,000 gsf across 11 aboveground stories, 3 levels of underground parking and retail space on Level 1. During the Core Shell and Tenant Fit-Out phases of construction, Code Red Consultants served as the project NFPA 3&4 Commissioning & Integrated Testing Agent, Smoke Control Special Inspector, and Firestopping Special Inspector (Tenant Fit-Out only). In this capacity, Code Red Consultants was responsible for conducting design and shop drawing level documentation reviews across multiple disciplines, development of Test Plans for building smoke control and integrated fire and life safety systems, conducting field inspections during construction, and verifying performance of the integrated systems at the completion of construction. A variety of core-shell and tenant fire and life safety systems were integrated with the building fire alarm system which required verification of proper control and/or monitoring. These systems included wet- and dry-pipe sprinkler and standpipe, fire pump, bi-directional amplifier system, elevators, fire and/or smoke dampers, HVAC systems, security systems, emergency power, post-fire smoke removal, clean agent fire suppression, and stair pressurization. Code Red Consultants worked in conjunction with John Moriarty & Associates to coordinate requirement and testing across multiple trades to ensure successful testing with the City of Cambridge Building and Fire Departments and on-time delivery of the building to the Owner. The Core Shell Building received its Temporary Certificate of Occupancy in Summer 2019 followed by a Certificate of Occupancy for the Philips North American Innovation Center in the Winter of 2019.

Location

Cambridge, Mass.

Size

430,000 GSF

Completion

Core/Shell Summer 2019 with Phillips Fit-Out Winter 2019

Parcel JK, Cambridge Crossing

Parcel JK is the first building to come online in the 4.5 M SF mixed-use Cambridge Crossing neighborhood currently in development by DivcoWest. Designed as a state-of-the-art science and technology building, Parcel JK comprises approximately 430,000 gsf across 11 aboveground stories, 3 levels of underground parking and retail space on Level 1. During the Core Shell and Tenant Fit-Out phases of construction, Code Red Consultants served as the project NFPA 3&4 Commissioning & Integrated Testing Agent, Smoke Control Special Inspector, and Firestopping Special Inspector (Tenant Fit-Out only). In this capacity, Code Red Consultants was responsible for conducting design and shop drawing level documentation reviews across multiple disciplines, development of Test Plans for building smoke control and integrated fire and life safety systems, conducting field inspections during construction, and verifying performance of the integrated systems at the completion of construction. A variety of core-shell and tenant fire and life safety systems were integrated with the building fire alarm system which required verification of proper control and/or monitoring. These systems included wet- and dry-pipe sprinkler and standpipe, fire pump, bi-directional amplifier system, elevators, fire and/or smoke dampers, HVAC systems, security systems, emergency power, post-fire smoke removal, clean agent fire suppression, and stair pressurization. Code Red Consultants worked in conjunction with John Moriarty & Associates to coordinate requirement and testing across multiple trades to ensure successful testing with the City of Cambridge Building and Fire Departments and on-time delivery of the building to the Owner. The Core Shell Building received its Temporary Certificate of Occupancy in Summer 2019 followed by a Certificate of Occupancy for the Philips North American Innovation Center in the Winter of 2019.

Pier 4 Residential Condominiums

Code Red Consultants provided consulting services for the new Pier Residential building located at 300 Pier 4 Boulevard in Boston’s Seaport District. Designed by CBT Architects and developed by Tishman Speyer, the 9-story, residential building offers scenic ocean views and features two below-grade parking levels, Ground Floor retail spaces, an amenity space, and residential condominium units. The building is adjacent to and interconnected with the Pier 4 Office Tower located at 200 Pier 4 Boulevard which opened in 2018. Code Red Consultants was responsible for commissioning the building’s smoke control systems and achieved BFD approval on the first acceptance test, helping Turner complete and open the project on time. Additionally, in collaboration with Turner Construction Company, KVA, and Tishman Speyer, Code Red worked to develop and implement an owner’s master construction fire safety program that allowed for building occupancy with continued base building and tenant fit-out construction work.

Location

Boston, Mass.

Size

240,000 GSF

Completion

2019

Pier 4 Residential Condominiums

Code Red Consultants provided consulting services for the new Pier Residential building located at 300 Pier 4 Boulevard in Boston’s Seaport District. Designed by CBT Architects and developed by Tishman Speyer, the 9-story, residential building offers scenic ocean views and features two below-grade parking levels, Ground Floor retail spaces, an amenity space, and residential condominium units. The building is adjacent to and interconnected with the Pier 4 Office Tower located at 200 Pier 4 Boulevard which opened in 2018. Code Red Consultants was responsible for commissioning the building’s smoke control systems and achieved BFD approval on the first acceptance test, helping Turner complete and open the project on time. Additionally, in collaboration with Turner Construction Company, KVA, and Tishman Speyer, Code Red worked to develop and implement an owner’s master construction fire safety program that allowed for building occupancy with continued base building and tenant fit-out construction work.

One Dalton Residences & Four Seasons Hotel

Code Red Consultants worked closely with Carpenter & Company and Suffolk Construction Company on this iconic, 61-story luxury hotel residential tower that transformed the Boston skyline and Back Bay. This project was erected during a period of heightened awareness of construction fire safety in the Commonwealth of Massachusetts. Code Red Consultants helped the building owner achieve early occupancy while still finalizing construction. This was achieved via close negotiations with city officials, where there was an upfront contract that the fire/life safety systems afforded to building occupants would not be compromised. Additionally, in collaboration with Four Seasons, Code Red worked to develop and implement an owner’s master construction fire safety program that allowed for building occupancy with continued base building and tenant fit-out construction work.

Location

Boston, Mass.

Size

712,000 GSF

Cost

$750 million

Completion

2019

One Dalton Residences & Four Seasons Hotel

Code Red Consultants worked closely with Carpenter & Company and Suffolk Construction Company on this iconic, 61-story luxury hotel residential tower that transformed the Boston skyline and Back Bay. This project was erected during a period of heightened awareness of construction fire safety in the Commonwealth of Massachusetts. Code Red Consultants helped the building owner achieve early occupancy while still finalizing construction. This was achieved via close negotiations with city officials, where there was an upfront contract that the fire/life safety systems afforded to building occupants would not be compromised. Additionally, in collaboration with Four Seasons, Code Red worked to develop and implement an owner’s master construction fire safety program that allowed for building occupancy with continued base building and tenant fit-out construction work.

Education First Phase III

Hult International Business School provides students with the ability to travel across the world, retain a college education, and develop the ability to conquer the business world. One of their many campuses is right here in Cambridge Massachusetts, located in the quickly developing Cambridge Crossing campus. The new Education First EF-III building was constructed to provide students with modern dormitories and recreational space allowing for a fluid environment for business relationships to flourish.

The new 12-Story building, constructed by Skanska, stands at 149’ tall and encompasses a total gross square footage of 282,230. The building includes dormitory living units, amenity and recreational spaces, and two floors of parking garage.

Throughout construction, Code Red Consultants developed a fire protection and life safety systems NFPA 3&4 report. The deliverable highlighted the fire protection systems throughout the building as well as the testing and commissioning requirements. This report set guidelines and expectations for construction team regarding how the systems should operate and be tested. Life safety system commissioning included but was not limited to the building fire alarm system, emergency voice alarm communication systems, wet sprinkler systems, dry sprinkler systems, Ansul systems, security system integration, HVAC system integration, smoke removal systems, and smoke control systems. Though the integrated life safety system commissioning required extensive coordination and no shortage of challenges, the Code Red team witnessed a successful test in time for the certificate of occupancy deadline.

Location

Cambridge, Mass.

Size

300,000 GSF

Completion

2019

Education First Phase III

Hult International Business School provides students with the ability to travel across the world, retain a college education, and develop the ability to conquer the business world. One of their many campuses is right here in Cambridge Massachusetts, located in the quickly developing Cambridge Crossing campus. The new Education First EF-III building was constructed to provide students with modern dormitories and recreational space allowing for a fluid environment for business relationships to flourish.

The new 12-Story building, constructed by Skanska, stands at 149’ tall and encompasses a total gross square footage of 282,230. The building includes dormitory living units, amenity and recreational spaces, and two floors of parking garage.

Throughout construction, Code Red Consultants developed a fire protection and life safety systems NFPA 3&4 report. The deliverable highlighted the fire protection systems throughout the building as well as the testing and commissioning requirements. This report set guidelines and expectations for construction team regarding how the systems should operate and be tested. Life safety system commissioning included but was not limited to the building fire alarm system, emergency voice alarm communication systems, wet sprinkler systems, dry sprinkler systems, Ansul systems, security system integration, HVAC system integration, smoke removal systems, and smoke control systems. Though the integrated life safety system commissioning required extensive coordination and no shortage of challenges, the Code Red team witnessed a successful test in time for the certificate of occupancy deadline.

Pier 4 Office Tower

Code Red Consultants provided consulting services for the new Pier 4 Office Tower in Boston’s Seaport District. Designed by Elkus Manfredi Architects and developed by Tishman Speyer, the 13-story, 375,000 SF office tower offers scenic ocean views and features three below-grade parking levels, ground-floor retail spaces, a fitness center, and an amenity roof terrace. The building is currently owned by CommonWealth Partners.

In collaboration with Turner Construction Company and City of Boston officials, Code Red Consultants worked to develop and implement a phased occupancy plan and an owner’s master construction fire safety program to allow for building occupancy while tenant fit-out construction continued on the upper levels. Code Red Consultants worked closely with Turner and Elkus Manfredi to prepare the Boston Fire Department (BFD) Place of Assembly permit applications for the amenity areas of the building. Code Red Consultants was also responsible for commissioning the building smoke control systems and achieved BFD approval in a timely manner, helping Turner complete construction and open the project on time.

Location

Boston, Mass.

Size

13 stories

Cost

Unknown

Completion

2019

Rending Credit | Photography Credit

James McLovin

Pier 4 Office Tower

Code Red Consultants provided consulting services for the new Pier 4 Office Tower in Boston’s Seaport District. Designed by Elkus Manfredi Architects and developed by Tishman Speyer, the 13-story, 375,000 SF office tower offers scenic ocean views and features three below-grade parking levels, ground-floor retail spaces, a fitness center, and an amenity roof terrace. The building is currently owned by CommonWealth Partners.

In collaboration with Turner Construction Company and City of Boston officials, Code Red Consultants worked to develop and implement a phased occupancy plan and an owner’s master construction fire safety program to allow for building occupancy while tenant fit-out construction continued on the upper levels. Code Red Consultants worked closely with Turner and Elkus Manfredi to prepare the Boston Fire Department (BFD) Place of Assembly permit applications for the amenity areas of the building. Code Red Consultants was also responsible for commissioning the building smoke control systems and achieved BFD approval in a timely manner, helping Turner complete construction and open the project on time.

Congress Square Mixed Use

Related Beal recently completed a substantial renovation and addition to 33 Congress Street, part of the “vertical urban campus” of the revitalized Congress Square in Downtown Boston. Once home to the world headquarters of Fidelity Investments, this property encompasses a full city block and is comprised of five interconnected buildings. Formally nine-stories in height, 33 Congress was gut renovated from the inside out and stacked with a new eight-story, vertical curtainwall addition.

Providing services directly to Related Beal as well as general contractor Consigli, Code Red Consultants prepared detailed NFPA 241 Construction Fire Safety & Impairment Plans to ensure that fire safety was properly maintained throughout the construction process. Code Red Consultants then developed a comprehensive Phased Occupancy Plan and Building Evacuation Plan that was approved by the Authority Having Jurisdiction, allowing the building to be occupied in phases while still under construction. Code Red Consultants also provided consulting services for all phases of the project, including assisting Elkus Manfredi (interiors architect) with the development of assembly permit drawings and collaborating with the installing fire alarm contractor to generate phased fire alarm design drawings Serving in a consulting role, Code Red Consultants provided valuable guidance, insight and expertise for this complex adaptive reuse project in the heart of downtown Boston.

Location

Boston, Mass.

Size

17 stories

Cost

$130 million

Completion

2018

Rending Credit | Photography Credit

Related Beal

Congress Square Mixed Use

Related Beal recently completed a substantial renovation and addition to 33 Congress Street, part of the “vertical urban campus” of the revitalized Congress Square in Downtown Boston. Once home to the world headquarters of Fidelity Investments, this property encompasses a full city block and is comprised of five interconnected buildings. Formally nine-stories in height, 33 Congress was gut renovated from the inside out and stacked with a new eight-story, vertical curtainwall addition.

Providing services directly to Related Beal as well as general contractor Consigli, Code Red Consultants prepared detailed NFPA 241 Construction Fire Safety & Impairment Plans to ensure that fire safety was properly maintained throughout the construction process. Code Red Consultants then developed a comprehensive Phased Occupancy Plan and Building Evacuation Plan that was approved by the Authority Having Jurisdiction, allowing the building to be occupied in phases while still under construction. Code Red Consultants also provided consulting services for all phases of the project, including assisting Elkus Manfredi (interiors architect) with the development of assembly permit drawings and collaborating with the installing fire alarm contractor to generate phased fire alarm design drawings Serving in a consulting role, Code Red Consultants provided valuable guidance, insight and expertise for this complex adaptive reuse project in the heart of downtown Boston.

Hub on Causeway Tower

Code Red Consultants worked closely with Boston Properties (BXP) and John Moriarty Associates (JMA) on the new 100 Causeway office tower which is the last major phase of The Hub on Causeway development project in Boston, Massachusetts. The 100 Causeway office tower consisted of 24 newly constructed stories above the recently completed East Podium. The base building received temporary certificate of occupancy in Spring 2021 with ongoing fit-out by anchor tenant Verizon Communications Inc.

Code Red Consultants collaborated with both BXP and JMA to develop and implement a complex NFPA 241 Construction Fire Safety Plan for the project. In addition, Code Red assisted in the development of a phased occupancy plan for the building which helped to allow the building to open on time with ongoing fit-out construction while maintaining the necessary levels of fire protection and life safety for the building.

Code Red Consultants was also responsible for performing Smoke Control Special Inspections of the building’s three pressurized stairways. During inspection, the smoke control special inspector (SCSI) verified that the smoke control equipment and system complied with the requirements contained within the applicable codes. The systems were accepted by the Boston Fire Department on the first acceptance test, helping JMA and BXP complete the project. In this spirit, the firm commissioned the building’s smoke control systems and achieved the Boston Fire Department approval on the first acceptance test visit.

Lastly, Code Red Consultants performed firestopping special inspection services for the project, helping to ensure the passive fire protection systems were appropriately selected and installed.

Location

Boston, Mass.

Size

1.8 million SF

Cost

$950 million

Completion

Ongoing

Rending Credit

Gensler

Hub on Causeway Tower

Code Red Consultants worked closely with Boston Properties (BXP) and John Moriarty Associates (JMA) on the new 100 Causeway office tower which is the last major phase of The Hub on Causeway development project in Boston, Massachusetts. The 100 Causeway office tower consisted of 24 newly constructed stories above the recently completed East Podium. The base building received temporary certificate of occupancy in Spring 2021 with ongoing fit-out by anchor tenant Verizon Communications Inc.

Code Red Consultants collaborated with both BXP and JMA to develop and implement a complex NFPA 241 Construction Fire Safety Plan for the project. In addition, Code Red assisted in the development of a phased occupancy plan for the building which helped to allow the building to open on time with ongoing fit-out construction while maintaining the necessary levels of fire protection and life safety for the building.

Code Red Consultants was also responsible for performing Smoke Control Special Inspections of the building’s three pressurized stairways. During inspection, the smoke control special inspector (SCSI) verified that the smoke control equipment and system complied with the requirements contained within the applicable codes. The systems were accepted by the Boston Fire Department on the first acceptance test, helping JMA and BXP complete the project. In this spirit, the firm commissioned the building’s smoke control systems and achieved the Boston Fire Department approval on the first acceptance test visit.

Lastly, Code Red Consultants performed firestopping special inspection services for the project, helping to ensure the passive fire protection systems were appropriately selected and installed.

The Beverly

The Beverly is a new 484,000 SF workforce and affordable housing development at 101 Beverly Street in Boston’s North Station neighborhood. The mixed-use building offers 239 income-targeted apartments with top amenities, a hotel, and ground floor retail in a premier transit-oriented location. The 14-story tower was designed by CBT Architects and built by Consigli Construction.

Code Red Consultants worked with owner/developer Related Beal, Consigli, and the City of Boston to create a comprehensive Construction Fire Safety (NFPA 241) Plan for this project. The NFPA 241 Plan was developed to address fire safety concerns for the occupants of the building (including construction workers and residents), pedestrians and adjacent buildings, and emergency first responders from the initial excavation phase all the way through to occupancy.

In addition, Related Beal wished to occupy the building before construction was complete. Code Red Consultants collaborated with Consigli and the City to identify compliance with the applicable codes and standards and illustrate the manner in which compliance would be achieved during the time active construction was ongoing while the building became partially occupied. Code Red Consultant’s efforts allowed Related Beal to occupy The Beverly and begin generating revenue prior to the completion of the building.

Location

Boston, Mass.

Size

484,000 SF

Cost

$230 million

Completion

2018

Photography Credit

Code Red Consultants

The Beverly

The Beverly is a new 484,000 SF workforce and affordable housing development at 101 Beverly Street in Boston’s North Station neighborhood. The mixed-use building offers 239 income-targeted apartments with top amenities, a hotel, and ground floor retail in a premier transit-oriented location. The 14-story tower was designed by CBT Architects and built by Consigli Construction.

Code Red Consultants worked with owner/developer Related Beal, Consigli, and the City of Boston to create a comprehensive Construction Fire Safety (NFPA 241) Plan for this project. The NFPA 241 Plan was developed to address fire safety concerns for the occupants of the building (including construction workers and residents), pedestrians and adjacent buildings, and emergency first responders from the initial excavation phase all the way through to occupancy.

In addition, Related Beal wished to occupy the building before construction was complete. Code Red Consultants collaborated with Consigli and the City to identify compliance with the applicable codes and standards and illustrate the manner in which compliance would be achieved during the time active construction was ongoing while the building became partially occupied. Code Red Consultant’s efforts allowed Related Beal to occupy The Beverly and begin generating revenue prior to the completion of the building.

South Bay Expansion

Code Red Consultants worked closely with joint developers EDENS and Pritzker Group, architecture firm Stantec, and general contractor Lee Kennedy Company on this massive 11-acre development and expansion of the existing South Bay Shopping Center in Dorchester. The 700,000 SF mixed-use development added five new buildings and approximately 475 residential units, 120,000 SF of retail space, a 60,000 SF cinema, and a 130-room hotel. A total of five new buildings were built.

The first three buildings achieved early occupancy in November 2017, a significant achievement considering they were erected in the midst of a heightened awareness of construction fire safety in the Commonwealth of Massachusetts. To that end, Code Red Consultants worked in parallel with Lee Kennedy to develop and implement a pre-incident fire plan and construction safety policies that allowed for a phased occupancy and permitted retailers the all-important opportunity to open their doors on Black Friday, and even construction continued on upper levels. This was achieved via continuous negotiations with City of Boston officials, where there was an upfront contract that the fire/life safety systems afforded to building occupants would not be compromised.

Code Red Consultants served as a trusted advisor to EDENS on South Bay, the real estate firm’s first major development project in Boston.

Location

Boston, Mass.

Size

700,000 SF

Cost

$200 million

Completion

2018

Rending Credit

EDENS

South Bay Expansion

Code Red Consultants worked closely with joint developers EDENS and Pritzker Group, architecture firm Stantec, and general contractor Lee Kennedy Company on this massive 11-acre development and expansion of the existing South Bay Shopping Center in Dorchester. The 700,000 SF mixed-use development added five new buildings and approximately 475 residential units, 120,000 SF of retail space, a 60,000 SF cinema, and a 130-room hotel. A total of five new buildings were built.

The first three buildings achieved early occupancy in November 2017, a significant achievement considering they were erected in the midst of a heightened awareness of construction fire safety in the Commonwealth of Massachusetts. To that end, Code Red Consultants worked in parallel with Lee Kennedy to develop and implement a pre-incident fire plan and construction safety policies that allowed for a phased occupancy and permitted retailers the all-important opportunity to open their doors on Black Friday, and even construction continued on upper levels. This was achieved via continuous negotiations with City of Boston officials, where there was an upfront contract that the fire/life safety systems afforded to building occupants would not be compromised.

Code Red Consultants served as a trusted advisor to EDENS on South Bay, the real estate firm’s first major development project in Boston.

The Auerbach Center at Boston Landing

Located at 40 Guest Street, The Auerbach Center at Boston Landing is the new world-class practice and training facility of the Boston Celtics. Code Red Consultants provided building and fire code consulting services for the six-story, 160,000 SF mixed-use building, which includes 5,700 SF of ground-floor retail, 190 parking spaces across one level at grade and two levels above grade, and two stories of shell space designated for offices and laboratories. The top two floors house the 70,000 SF practice facility for the Boston Celtics, featuring two NBA regulation basketball courts, a locker room, hospitality space, kitchen facilities, offices, and common areas. A 40-foot glass wall enclosing the practice courts offers prime visibility of the basketball practice facility from the adjacent Massachusetts Turnpike.

Code Red Consultants completed a performance-based analysis to remove fireproofing from steel trusses located above the Celtics practice court. The effort included creating a computational fluid dynamics analysis to evaluate severe case fire scenarios within the double height basketball court to determine the temperature and radiant heat flux to which the steel trusses would be exposed. This study was used to win approval of a state code appeal allowing the desired fireproofing to be removed.

Boston Landing is a 15-acre mixed-use development in the Allston-Brighton neighborhood of Boston that includes the new world headquarters of New Balance Athletics, Inc. and the Boston Bruins practice facility. In addition, the development includes a commuter rail station, additional office buildings, retail and restaurant space, a hotel, and a sports complex.

The project team for the Auerbach Center includes NB Development Group, Elkus Manfredi Architects, and John Moriarty & Associates General Contractors.

Location

Boston, Mass.

Size

160,000 SF

Cost

$70 million

Completion

2018

The Auerbach Center at Boston Landing

Located at 40 Guest Street, The Auerbach Center at Boston Landing is the new world-class practice and training facility of the Boston Celtics. Code Red Consultants provided building and fire code consulting services for the six-story, 160,000 SF mixed-use building, which includes 5,700 SF of ground-floor retail, 190 parking spaces across one level at grade and two levels above grade, and two stories of shell space designated for offices and laboratories. The top two floors house the 70,000 SF practice facility for the Boston Celtics, featuring two NBA regulation basketball courts, a locker room, hospitality space, kitchen facilities, offices, and common areas. A 40-foot glass wall enclosing the practice courts offers prime visibility of the basketball practice facility from the adjacent Massachusetts Turnpike.

Code Red Consultants completed a performance-based analysis to remove fireproofing from steel trusses located above the Celtics practice court. The effort included creating a computational fluid dynamics analysis to evaluate severe case fire scenarios within the double height basketball court to determine the temperature and radiant heat flux to which the steel trusses would be exposed. This study was used to win approval of a state code appeal allowing the desired fireproofing to be removed.

Boston Landing is a 15-acre mixed-use development in the Allston-Brighton neighborhood of Boston that includes the new world headquarters of New Balance Athletics, Inc. and the Boston Bruins practice facility. In addition, the development includes a commuter rail station, additional office buildings, retail and restaurant space, a hotel, and a sports complex.

The project team for the Auerbach Center includes NB Development Group, Elkus Manfredi Architects, and John Moriarty & Associates General Contractors.