In this week’s issue of the Return to Work Tool Kit issued by the Boston Real Estate COVID Consortium, Chris Lynch, P.E. weighs in on various code compliance topics relating to the re-opening of offices. Topics include points of caution with installing door locking devices, modifying signage as it relates to egress, and creating sprinkler obstructions if installing temporary partitions. Additionally, Chris discusses the various allowable options for determining the 25% head count limitation. The article also contains great information on office furniture changes and signage and graphics authored by other Consortium team members. Read the full article here.
June 11, 2020
Application of any information provided, for any use, is at the reader’s risk and without liability to Code Red Consultants. Code Red Consultants does not warrant the accuracy of any information contained in this blog as applicable codes and standards change over time. The application, enforcement and interpretation of codes and standards may vary between Authorities Having Jurisdiction and for this reason, registered design professionals should be consulted to determine the appropriate application of codes and standards to a specific scope of work.