Education First Phase III

Hult International Business School provides students with the ability to travel across the world, retain a college education, and develop the ability to conquer the business world. One of their many campuses is right here in Cambridge Massachusetts, located in the quickly developing Cambridge Crossing campus. The new Education First EF-III building was constructed to provide students with modern dormitories and recreational space allowing for a fluid environment for business relationships to flourish.

The new 12-Story building, constructed by Skanska, stands at 149’ tall and encompasses a total gross square footage of 282,230. The building includes dormitory living units, amenity and recreational spaces, and two floors of parking garage.

Throughout construction, Code Red Consultants developed a fire protection and life safety systems NFPA 3&4 report. The deliverable highlighted the fire protection systems throughout the building as well as the testing and commissioning requirements. This report set guidelines and expectations for construction team regarding how the systems should operate and be tested. Life safety system commissioning included but was not limited to the building fire alarm system, emergency voice alarm communication systems, wet sprinkler systems, dry sprinkler systems, Ansul systems, security system integration, HVAC system integration, smoke removal systems, and smoke control systems. Though the integrated life safety system commissioning required extensive coordination and no shortage of challenges, the Code Red team witnessed a successful test in time for the certificate of occupancy deadline.

Location

Cambridge, Mass.

Size

300,000 GSF

Completion

2019

Education First Phase III

Hult International Business School provides students with the ability to travel across the world, retain a college education, and develop the ability to conquer the business world. One of their many campuses is right here in Cambridge Massachusetts, located in the quickly developing Cambridge Crossing campus. The new Education First EF-III building was constructed to provide students with modern dormitories and recreational space allowing for a fluid environment for business relationships to flourish.

The new 12-Story building, constructed by Skanska, stands at 149’ tall and encompasses a total gross square footage of 282,230. The building includes dormitory living units, amenity and recreational spaces, and two floors of parking garage.

Throughout construction, Code Red Consultants developed a fire protection and life safety systems NFPA 3&4 report. The deliverable highlighted the fire protection systems throughout the building as well as the testing and commissioning requirements. This report set guidelines and expectations for construction team regarding how the systems should operate and be tested. Life safety system commissioning included but was not limited to the building fire alarm system, emergency voice alarm communication systems, wet sprinkler systems, dry sprinkler systems, Ansul systems, security system integration, HVAC system integration, smoke removal systems, and smoke control systems. Though the integrated life safety system commissioning required extensive coordination and no shortage of challenges, the Code Red team witnessed a successful test in time for the certificate of occupancy deadline.